Title: The settlements of the changes introduced on the infrastructure investment Contract based on the FIDIC Contract Conditions- case study

Authors: LENDO-SIWICKA, M., PAWLUK, K., ŻEREK, P., TRACH, R.

Keywords: FIDIC Contract Conditions, Procedure of Change Command, Change Command

Abstract: The article presents a settlement analysis of introduced changes in the example infrastructure investment. The procedure of introduced the Change Command and the Engineer's Instruction on the Construction contract, as well as examples of the Change Commands given by the Engineer on the analyzed object were presented. The study covered the settlement of a road investment, based on compliance with expressway parameters. The analyzed object was very composed, thus has an extended bill of quantities and cost estimate. In accordance to such an extended cost estimate for this investment, it was important to establish an appropriate and fast flow of settlement documents. Moreover, changes in the project documentation and settlement based on the Contract Conditions for the Construction for Engineering - Construction Works designed by the Employer - the so-called. & quot;Red Book& quot; was showed. The studies discussed the cases of settlement of increased quantities, new entry items and replacement construction works that occurred on the analyzed investment, as well as examples of a sample settlement documents. The authors of this studies conclude that the introduction of the Engineer in the early stages of the investment process and the overall FIDIC procedures help establish sample forms, development of working out procedures and document flow schemes, including a settlement documents. In consequence they minimize the costs of addition, replacement, and abandoned works and reduce the time of the investment realization.

DOI: 10.22630/PNIKS.2018.27.3.38

APA style references: Lendo-Siwicka, M., Pawluk, K., Żerek, P. & Trach, R. (2018). The settlements of the changes introduced on the infrastructure investment Contract based on the FIDIC Contract Conditions- case study. Scientific Review Engineering and Environmental Sciences, 27 (3), 387-386. doi: 10.22630/PNIKS.2018.27.3.38

APA style citation in text: The first time citation in text: (Lendo-Siwicka, Pawluk, Żerek & Trach, 2018), next citation: (Lendo-Siwicka et al., 2018)

Chicago style references: Lendo-Siwicka, Marzena, Katarzyna Pawluk, Paulina Żerek, Roman Trach. "The settlements of the changes introduced on the infrastructure investment Contract based on the FIDIC Contract Conditions- case study." Scientific Review Engineering and Environmental Sciences, 81 ser., vol. 27, no 3, (2018): 387-386. doi: 10.22630/PNIKS.2018.27.3.38.

Chicago style citation in text: (Lendo-Siwicka et al. 2018)

Bibtxt style references: Bibtxt_utf8_81art15en.bib

More citations in MLA, Harvard, RIS e.t.c styles in CrossRef database: Actions/Cite

Full text PDF (in Polish)


Go Back